Specialists

Mass Timber

We are design

We are sustainable architecture

icimo2

About Enkel Architecture Studio

At Enkel Architecture Studio, we focus on innovative and sustainable construction. As specialists in industrialized construction and Mass Timber, we apply design methods that optimize construction execution times, reduce costs and minimize environmental impact. We always maintain the highest quality standards, respecting the unique imprint of each project.

How We Work

Our approach is organized in three consecutive stages:

P1 - Basic Preliminary Design

In this initial stage, we develop the concept and general planning of the project. We define the layout, scale, shape, form, capacity and function of the spaces. Our goal is to design a solution that meets functional needs, achieves the desired image and generates meaningful spaces.

 

P2 - Advanced Preliminary Design

Once the basic preliminary design has been approved, we go deeper into the material aspects and the development of the systems and installations. In this phase, we carry out the engineering blueprints and define the finishing materials.

P3 - Executive Project

In the final stage, we produce all the necessary documentation for the construction, including graphics and technical details that ensure the correct execution of the work according to the agreed deadlines and specifications.

Get to know our projects

Hotel Viña Edén

 Surface area: 6.184m²
Construction system: Mass Timber
Stage worked for this project: P1

Ampliación Casa de Campo

Surface area: 268 m²
Stage worked for this project: P1

Proyecto de Oficinas

Surface area: 10800 m²
Construction system: Mass Timber
Stage worked for this project: P1

Casa Polo

Surface area: 200 m²
Construction system: Mass Timber
Stage worked for this project: P1

Casa Reserva Montoya

Surface area: 418 m²
Sistema constructivo: Mass Timber
Stage worked for this project: P1

Los Ranchos

Surface area: 520 m² la vivienda + 215 m² caballeriza.
Construction system: Mass Timber
Stage worked for this project:  P1+P2

Casa R12

Surface area: 160 m²
Construction system: Mass Timber
Stage worked for this project: P1+ P2+P3

Durazno

Surface area: 1945 metros cubiertos.
Construction system: Mass Timber
Stage worked for this project: P1+ P2 +P3

Casa Arenas de José Ignacio

Surface area: 205 m²
Construction system: Mass Timber
Stage worked for this project: P1+ P2 + P3

Contact us

Tell us about your project.

Our team will contact you to advise you.

    Scroll to Top