Did you know that building in wood can also be industrialized? Mass Timber is not only wood, it is robotic precision, speed and quality certified to European standards. Construction at height, without waste and with record times. The future of construction? It is already here.
Our method is divided into 3 key stages:
P1 – Basic Preliminary Project: Concept and general planning.
P2 – Advanced Preliminary Design: Materiality and operation.
P3 – Executive Project: Technical documentation for construction. At each stage, we adapt the design to your needs, ensuring functional and sustainable spaces.